BSB block sand erosion control dam construction method [Reduction of transportation and disposal costs for surplus soil is possible!]
A block sand erosion control dam method that reduces residual soil disposal and allows for the reduction of transportation and disposal costs!
To use excavated soil and locally generated soil around the construction site as structural materials, it is possible to reduce the amount of leftover soil and minimize transportation and disposal costs. The cement and materials such as locally generated soil used in the BSB block sediment control dam method can all be utilized as long as they meet the required quality after mixing. Therefore, by adopting the BSB block sediment control dam method, it is possible to plan, design, and construct sediment control works that minimize the amount of excavated soil. 【Features】 ■ Reduction in leftover soil treatment and possible reduction in transportation and disposal costs ■ Possible reduction in material costs and construction costs ■ Even without constructed access roads, it is possible to transport construction machinery and cement using cableways, etc. *For details, please request materials or view the PDF data from the download.
- Company:丸高コンクリート工業
- Price:Other